top of page

The Duck and the Darklings 

WIP Design 

Key Delivery:

Detailed meeting to discuss the budget for the design and set build and Producer to provide approval: by the 11 August 2023. 

Design the complete set design for the entire production, by: 1 September 2023

Complete the build of the living spaces, by 28 August 2023

Complete costume renderings for each character, by 28 August 2023

Attend any and all design meetings and/or production meetings

Ongoing between date of execution and the end of the week commencing 28 August 2023

Attend the creative development during the week commencing 28 August 2023

Files to Download

Safety Work Method (SWMs)

In progress

0KB

Download

Engineering Certificate

In progress

0KB

Download

FR Certificate / Textile Data Sheet

Results of E23 FR test

180KB

Insurances

$20M Public Liability 

$20M Products Liability 

$5M Professional Indemnity 

$250,000 Property in Care

80KB

Download

Studio Marketing Package

In progress

0KB

Download

Project Marketing Package

In progress

0KB

Download

Frequency Asked Questions

In progress, but basic info about handling

80KB

Invoice

Phase One Invoice

150KB

Contract

Phase One Contract

310KB

Working with Children Check

Police Check

1.6MB

bottom of page